ELAN CARE

Meetings of ELAN in 2004

Next meetings in 2004:

The next meeting will be the first annual CARE meeting at DESY.

Past meetings 2004

TESLA Meeting in Orsay

The LTECSC work package will meet at the next TTF Collaboration Meeting in Orsay (likely date 6th to 8th of September 2004) to discuss superconducting accelerator technology reliability issues .

First ELAN Workshop in Frascati 4th to 6th of May 2004

The First Workshop of ELAN took place at INFN Frascati, May 4 to 6, 2004. Link to the ELAN Workshop.

Agenda for the workpackage 'Superconducting technology'


A brief description of the superconducting technology will be given together with an update of the present status of superconducting cavities for a linear collider. The LTECSC work package planning will be presented. It should be the opportunity for the network participants to discuss the outlined programme for this work package within the ELAN network and its strategy. A critical review of the deliverables is desirable and should lead to a more detailed planning of the work. The focus of this discussion should be on the major added value of the network i.e. the dissemination of knowledge (setup of of a database, training courses for newcomers).

The discussion will also cover the interconnection of the ELAN LTECSC work package with the JRA1 SRF and HIPPI WP3. This will include presentations of the work package leaders of the JRAs.

 

Topic

 

Speaker

 

1.

Introduction LTECSC

Schedule, Deliverables

L. Lilje

PDF

2. a)

JRA -SRF Presentation

     
 

WP1

Schedule, Deliverables

D. Proch

PDF

 

WP2

Schedule, Deliverables

P. Michelato

PDF

 

WP3

Schedule, Deliverables

W.-D. Möller

PDF

 

WP4

Schedule, Deliverables

Langner

PDF1,PDF2

 

WP5

Schedule, Deliverables

L. Lilje, D. Reschke

PDF1,PDF2

 

WP6

Schedule, Deliverables

E. Palmieri

PDF

 

WP7

Schedule, Deliverables

M. Omeich

PDF

 

WP8

Schedule, Deliverables

P. Sekalski

PDF

 

WP9

Schedule, Deliverables

St. Simrock

PDF

 

WP10

Schedule, Deliverables

B. Visentin

PDF

 

WP11

Schedule, Deliverables

C. Magne, M. Castellano

PDF

2.b)

JRA HIPPI Presentation

     
   

Schedule, Deliverables

S. Chel/C. Pagani (Presenter: A. Bosotti)

 

3.

Discussion on interconnection of JRAs and ELAN LTECSC

   

PDF

4.

Work plan discussion

Database setup, Planning of training course

   

 

 
top